Floors one to three are completed, and the vertical structure of the forth, fifth and sixth floors erected. Installation of 4th floor structural walls (1) The installation of the 4th floor structural walls continues (2) Installation of 4th floor structural walls (3) Installation of 4th floor structural walls (4) The finished structural walls arrive on a flat bed at the site ready for installation Installation of 5th floor prefabricated slabs after the walls of the fourth floor were mounted The slabs are set in place intended via a mobile crane The crane lowers the slab to its final location Nine floor building erected ready for roof Structure completed 125,00 sq.ft. Hotel executed in 15 1/2 months from ground-breaking to a certified “customer ready” property

 

 
 